Engineering Lab

// factory QC · burn-in

Motor Burn-In Before Carton Close

Shaoxing line runs automated shuffle cycles with empty tile load, then full load. Units failing thermal or current draw thresholds do not ship.

Installer verify list

  • First boot shows error 00 (normal idle)
  • 5 s power delay active — motor does not spin instantly
  • Serial on control board matches carton manifest

INEAN PLAY Official Site